Skip to main content

Apr 21, 2026

Ceres SOFC Systems for data centres

Take a look at our video demonstrating how the Ceres® Endura™ stack can be scaled up to 100kW power modules and how these in turn can be scaled through 500kW Power Systems in 2MW blocks up to a representative 108MW data centre installation. Supporting modular, scalable installation with high efficiencies, low carbon emissions and capable of achieving 'five nines' availability with only 10% over-sizing. 

Let's talk